Infrastructure

  • Dispensing of active and inactive materials in separate dispensing room under an SS reverse laminar flow.
  • Segregated storage for raw material, packaging materials and finished goods with controlled room temperature facilities.
  • Separate air-handling units for every production department and QC department with classified filtration.
  • Quality Controlled Laboratory with modular furniture and well-equipped with HPLC, UV Spectrophotometer, KF Autotitrator, Microbiology and Sterility area under class 10,000.
  • Water Treatment system with Soft Water, RO (Reverse Osmosis), EDI (Electron de Ionization) and SS 316L pipeline in loop form with TOC Meter and UV lamp for absolute purity of water.
  • In all manufacturing area, men and material movement are separate.
  • Capacity of tube filling cumulative of 50 lakh of tubes per month and we can expand it up to 1 crore tubes per month.
  • Capacity of lotion filling cumulative of 5 lakh of bottles per month and we can expand it up to 10 lakh bottles per month.
TOP